Building Estimation and Costing

Estimate, glossary of technical terms, analysis of rates, methods and unit of measurement, Items of work – earthwork, Brick work (Modular & Traditional bricks), RCC work, Shuttering, Timber work, Painting, Flooring and Plastering. Boundary wall, Brick building, Water Tank, Septic tank, Bar bending schedule, Centre line method, Mid-section formula, Trapezoidal formula, Simpson’s rule. Cost estimate of Septic tank, flexible pavements, Tube well, isolates and combined footings, Steel Truss, Piles and pile-caps. Valuation – Value and cost, scrap value, salvage value, assessed value, sinking fund, depreciation and obsolescence, methods of valuation.

Register Now

4 Weeks Training / Winter Training
  • Introduction
  • Customizing Currencies & Catalog Creation
  • Work Breakdown Structure
  • Manual Takeoff Tools: Area, Backout, Linear, Count
  • Automatic Takeoff Tools: Model, Search, Single Click
  • Assembly & Validate Takeoff Data
  • Calculate estimated cost of civil construction projects
  • Compare & Display
  • Evaluate the actual value of any property